EXECUTIVE SUMMARY |
|
Chapter I:
Introduction |
|
Chapter II:
Hydrologic Studies |
|
|
Development of Hydrologic Parameters |
|
|
Rational Method Hydrology Studies |
|
|
Unit Hydrograph Studies |
|
Chapter III:
Hydraulic Design Criteria and Facility Sizing |
|
|
Debris Yield |
|
|
Hydraulic Design Criteria |
|
|
Hydraulic Sizing of Conveyance Systems |
|
|
Hydraulic Sizing of Detention Basins |
|
|
Preparation of Plan and Profile Drawings |
|
Chapter IV:
Preparation of Cost Estimates |
|
|
Basis of Cost Estimates |
|
|
Criteria |
|
|
Development of Unit Cost |
|
|
Results of Cost Estimate Study |
|
Chapter V:
Description of Recommended Flood
Control Master Plan Facilities |
|
|
Description of Primary Drainage Course Improvements |
|
|
Description of Detention/Debris Basins |
|
Chapter VI:
Phasing For Implementation of Improvements |
|
Chapter VII:
Tables |
|
1. |
Peak Discharges for Non-Detained Alternative |
|
2. |
Peak Discharges for Detained Alternative |
|
3. |
Debris Yield Calculations |
|
4. |
Summary of Hydraulic Sizing Calculations, Regional, Secondary
and Local Facilities, Non-Detained Alternative |
|
5. |
Summary of Hydraulic Sizing Calculations, Regional, Secondary
and Local Facilities, Detained Alternative |
|
6. |
Summary of Cost Estimates for the Non-Detailed and Detained Alternatives |
|
7. |
Cost Estimate for Non-Detained Alternative |
|
8. |
Cost Estimate for Detained Alternative |
|
9. |
Detention Basin Costs |
|
10. |
Recommended Priority for Implementation of Master Improvements |
|
Chapter VIII:
Figures |
|
1. |
Proposed Drainage Facilities,
Index Map |
|
2. |
Existing and Proposed Drainage Facilities,
Base Map |
|
3. |
Existing Drainage Facilities and Utilities
Map |
|
4. |
|
| |
|
|
|
5. |
Pinon Creek:
P01 |
|
6. |
Camino Del Cielo:
P01-01 & P01-02 |
|
7. |
Water Canyon Channel: Y12
Water Canyon Channel Tributary: Y12-01 |
|
8. |
Kickapoo Drain: K01 & K01-02
La Honda Drain: K01-01
Inca Trail Wash: K01-03 |
|
9. |
Yucca Wash:
Y01 |
|
10. |
Yucca Wash: Y01
Crestview Wash: Y01-02 |
|
11. |
Yucca Wash: Y01
Santa Fe Trail: Y01-03 |
|
12. |
Long Canyon Wash: Y07 |
|
13. |
Long Canyon Channel: Y07 |
|
14. |
Sage Avenue Drain: Y07-01
Long Canyon Wash Tributary: Y08 |
|
15. |
Hospital Channel: Y09 & Y09-03 |
|
16. |
High School Channel: Y09-01
Cholla Avenue Drain: Y09-02 |
|
17. |
Acoma Channel: Y10
Deer Trail Channel: Y11 |
|
18. |
Buena Vista Wash: Y10 & Y10-01
Deer Trail Channel: Y11 & Y11-01 |
|
19. |
Buena Vista Wash: Y05 & Y05-01
Sage Channel: Y06 |
|
20. |
West Burnt Mountain Wash: Y02 |
|
21. |
West Burnt Mountain Wash: Y02 & Y02-02 |
|
22. |
Warren Vista Drain: Y02-01 |
|
23. |
East Burnt Mountain Wash: Y03
East Burnt Mountain Wash Tributary: Y03-01 |
|
24. |
East Burnt Mountain Wash: Y03 & Y03-02 |
|
25. |
Farello Wash: Y04-01
OWS Channel: Y04
OWS Road Wash: Y04-02 |
|
26. |
Hanford Avenue Drain: Y01-01 |
|
27. |
Covington Wash: C01 |
|
28. |
Covington Wash: C01 |
|
29. |
Covington Wash: C01
East Fork: C02 |
|
30. |
Black Rock Wash: C03
Carmelita Wash West Fork: C03-01 |
|
31. |
Skyline Ranch Wash: S01
Ranch West: S01-01 |
|
32. |
South Skyline Wash: S02
Puente Channel: S02-01 |
|
33. |
Sierra Vista Wash: V01 |
|
34. |
Sierra Vista Wash: V01 & V01-02 |
|
35. |
Chipmunk Wash: V01-01
Hillcrest Wash: V01-03 |
|
36. |
La Contenta Wash: C04 & C04-01 |
|
37. |
Water Canyon Basin |
|
38. |
Kickapoo Basin |
|
39. |
Acoma Basin |
|
40. |
Long Canyon Basin |
|
41. |
East Burnt Mountain Basin |
|
42. |
West Burnt Mountain Basin |
|
Chapter IX:
Appendices Not Included on Website |
|
Appendix A |
|
|
Policy Report and Conceptual Master Plan |
|
|
Summary Report on Data Collection |
|
Appendix B |
|
|
Watershed Photographic Record |
|
|
GIS Layers |
|
|
GIS CD |
|
Appendix C |
|
|
Hydrologic Studies |
|
|
Unit Hydrograph Studies, Volumes I through VII |
|
|
Rational Method Studies, Volumes VIII through XI |
|
Appendix D |
|
|
Hydraulic Sizing Calculations and Debris Yield Studies |
|
|
Open Channels |
|
|
Underground Conduits |
|
|
Debris Yield Studies |
|
Appendix E |
|
|
Non-Detained Master Plan Flood Control Facilities |
|
|
Plan and Profile Drawings |